摘要 :
The Johnson Space Center s (JSC) International Space Station (ISS) Space Flight Resource Management (SFRM) training program is designed to teach the team skills required to be an effective flight controller. It was adapted from th...
展开
The Johnson Space Center s (JSC) International Space Station (ISS) Space Flight Resource Management (SFRM) training program is designed to teach the team skills required to be an effective flight controller. It was adapted from the SFRM training given to Shuttle flight controllers to fit the needs of a '24 hours a day/365 days a year' flight controller. More recently, the length reduction of technical training flows for ISS flight controllers impacted the number of opportunities for fully integrated team scenario based training, where most SFRM training occurred. Thus, the ISS SFRM training program is evolving yet again, using a new approach of teaching and evaluating SFRM alongside of technical materials. Because there are very few models in other industries that have successfully tied team and technical skills together, challenges are arising. Despite this, the Mission Operations Directorate of NASA s JSC is committed to implementing this integrated training approach because of the anticipated benefits.
收起
摘要 :
This present collection was inspired by seven papers prepared by the NASA Alumni League, illustrating the members' systems engineering experience. These papers make up the heart of this collection. We have supplemented them with p...
展开
This present collection was inspired by seven papers prepared by the NASA Alumni League, illustrating the members' systems engineering experience. These papers make up the heart of this collection. We have supplemented them with papers describing industry processes and other governmental practices to illustrate the diversity of systems engineering as it is formulated and practiced. This is one discipline that clearly benefits from cross-fertilization and infusion of new ideas. There is also a wide variety of tools and techniques described herein, some standard and some unique.
收起
摘要 :
Training includes both SFRM-dedicated lessons and SFRM training embedded into technical lessons. Goal is to reduce certification times by 50% and integrated simulations by 75-90%. SFRM is practiced, evaluated and debriefed in part...
展开
Training includes both SFRM-dedicated lessons and SFRM training embedded into technical lessons. Goal is to reduce certification times by 50% and integrated simulations by 75-90%. SFRM is practiced, evaluated and debriefed in part task trainers and full-task simulation lessons. SFRM model and training are constantly being evaluated against student/management feedback, best practices from industry/ military, and latest research.
收起
摘要 :
Mission Operations and Command Assurance (MO&CA) is a Total Quality Management (TQM) task on JPL projects to instill quality in flight mission operations. From a system engineering view, MO&CA facilitates communication and problem-solving among flight teams and provides continuous solving among flight teams and provides continuous process improvement to reduce risk in mission operations by addressing human factors. The MO&CA task has evolved from participating as a member of the spacecraft team, to an independent team reporting directly to flight project management and providing system level assurance. JPL flight projects have benefited significantly from MO&CA's effort to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit from previous and ongoing flight experience....
展开
Mission Operations and Command Assurance (MO&CA) is a Total Quality Management (TQM) task on JPL projects to instill quality in flight mission operations. From a system engineering view, MO&CA facilitates communication and problem-solving among flight teams and provides continuous solving among flight teams and provides continuous process improvement to reduce risk in mission operations by addressing human factors. The MO&CA task has evolved from participating as a member of the spacecraft team, to an independent team reporting directly to flight project management and providing system level assurance. JPL flight projects have benefited significantly from MO&CA's effort to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit from previous and ongoing flight experience.
收起
摘要 :
In order to increase survivability and maximize performance, autonomous vehicles require the development of algorithms that fulfill the role of an adaptive human pilot in response to failures, damage, or uncertain vehicle dynamics...
展开
In order to increase survivability and maximize performance, autonomous vehicles require the development of algorithms that fulfill the role of an adaptive human pilot in response to failures, damage, or uncertain vehicle dynamics. Hence, the guidance and control algorithms implemented on autonomous vehicles must be able to react and compensate, whenever possible, for failures so that their impact can be minimized. In this work, an adaptive reconfigurable inner-loop controller is developed for a modified version of the X-40A Space Maneuvering Vehicle. The purpose of this inner loop control system is to accurately track body-frame angular velocity vector commands, while automatically reacting to and compensating for failures, damage, or uncertain vehicle dynamics.
收起
摘要 :
This paper discusses the history of SE&I management of the overall program architecture, organizational structure and the relationship of SE&I to other program organizational elements. A brief discussion of the method of executing the SE&I process, a summary of some of the major lessons learned, and identification of things that have proven successful are included....
展开
This paper discusses the history of SE&I management of the overall program architecture, organizational structure and the relationship of SE&I to other program organizational elements. A brief discussion of the method of executing the SE&I process, a summary of some of the major lessons learned, and identification of things that have proven successful are included.
收起
摘要 :
NASA is developing a flight deck decision support tool to support research into autonomous operations in a future distributed air/ground traffic management environment. This interactive real-time decision aid, referred to as the A...
展开
NASA is developing a flight deck decision support tool to support research into autonomous operations in a future distributed air/ground traffic management environment. This interactive real-time decision aid, referred to as the Autonomous Operations Planner (AOP), will enable the flight crew to plan autonomously in the presence of dense traffic and complex flight management constraints. In assisting the flight crew, the AOP accounts for traffic flow management and airspace constraints, schedule requirements, weather hazards, aircraft operational limits, and crew or airline flight-planning goals. This paper describes the AOP and presents an overview of functional and implementation design considerations required for its development. Required AOP functionality is described, its application in autonomous operations research is discussed, and a prototype software architecture for the AOP is presented.
收起
摘要 :
This paper presents the results of a computer simulation of the NASA Autonomous Flight Rules (AFR) concept for airborne self-separation in airspace shared with conventional Instrument Flight Rules (IFR) traffic. This study was des...
展开
This paper presents the results of a computer simulation of the NASA Autonomous Flight Rules (AFR) concept for airborne self-separation in airspace shared with conventional Instrument Flight Rules (IFR) traffic. This study was designed to determine the impact of varying levels of intent information from IFR aircraft on the performance of AFR conflict detection and resolution. The study used Automatic Dependent Surveillance-Broadcast (ADS-B) to supply IFR intent, but other methods such as an uplink from a ground-based System Wide Information Management (SWIM) network could alternatively supply this information. The independent variables of the study consist of the number of ADS-B trajectory change reports broadcast by IFR aircraft and the time interval between those reports. The conflict detection and resolution metrics include: the number of conflicts and losses of separation, the average conflict warning time, and the amount of time spent in strategic vs. tactical flight modes (i.e., whether the autoflight system was decoupled from the planned route in the Flight Management System in order to respond to a short-notice traffic conflict). The results show a measurable benefit of broadcasting IFR intent vs. relying on state-only broadcasts. The results of this study will inform ongoing separation assurance research and FAA NextGen design decisions for the sharing of trajectory intent information in the National Airspace System.
收起